Client: A&B Engineering (M.S.D) Limited | |
Year: 2018 | |
Location: Salford UK | |
System: Sprinkler |
Premiermist were proud to be included in the Trinity Riverside project in conjunction with A&B Engineering (M.S.D) Limited. The main contractors; Trinity Riverside Holdings had expressed a need for Residential Sprinkler systems to be installed in 190 apartments and various amenity areas. Premiermist tenedered and won the contract to design, manage, supervise, deliver and install a complete Sprinkler and Dry Riser system into the Trinity Riverside project.
The project incorporated two buildings, Riverview a 35 storey tower with 318 apartments, and Riverside, a 17 storey block providing 188 apartments as well as resident’s amenity and commercial space.
Premiermist were contracted to design and install a Sprinkler and Dry Riser system at the Riverside, 17 storey block of apartments.
Sign up for our newsletter and follow us on social media